Testimonials

We have found the business park to be a high profile, very convenient location with easy access to all major highway routes connecting Charlottetown with the remainder of the Province. 

George Zafiris, P.Eng
Senior Associate
Geotechnical Engineering
Stantec 



Latest News Items

New Airport Business Park Tenant – Adrok
more >

Aviation Avenue Upgrade and Servicing
more >

Aerospace Tax Rebate Program Extension Announcement
more >


BioVectra Press Releases

Useful Links

Site Development Geotechnical Characteristics

Soils reports have indicated that the subsurface encountered may be summarized as 0.7 to 1.0 m (average 0.8 m) of existing fill/rootmat/topsoil that overlies a competent native till soil. Neither bedrock nor the groundwater table were encountered within the depth investigated.

The conditions encountered are considered to be favorable for site development and building construction. Site preparation for proposed buildings and parking areas would require the removal of the existing fill/rootmat/topsoil and the subsequent placement of structural fill up to the required subgrade level. Pit-run sandstone (Select Borrow) is typically utilized as structural fill on PEI and is available in close proximity to the airport property.

George Zafiris, P.Eng
Senior Associate
Geotechnical Engineering
Stantec